Each entry sets out the parameters a supplier will ask you for. Define them up front and the enquiry goes out complete the first time. These are checklists for your enquiry, not stock we are holding.

Sectors 9
Commodities 79

Ferroalloys

07 commodities

Bulk and noble alloys for steelmaking and foundry. Priced against alloy content, penalised on carbon, phosphorus and sulphur.

Non-ferrous & scrap

07 commodities

Refined metal and recovered material. On cathode and ingot the registered brand is half the price; on scrap, the grade code is the contract.

Ores & industrial minerals

12 commodities

Run-of-mine and beneficiated material, priced on a dry basis per unit of contained metal. Penalty elements decide what the cargo is actually worth.

Fertilisers

09 commodities

Nitrogen, phosphate and compound products. Sold on nutrient units and rejected on caking, so how it arrives matters as much as how it assays.

Industrial chemicals

07 commodities

Base chemicals in bulk and packed form. What your terminal can discharge usually settles the form before price enters the conversation.

Energy & carbon

14 commodities

Refined products, solid fuels and carbon. We quote only against refinery or terminal supply we can inspect at load.

Polymers

05 commodities

Prime and off-grade resin. Send the grade sheet your line runs on, not the polymer name.

Steel & semi-finished

04 commodities

Long and flat product, and the billet behind it. The standard the drawing is written to decides acceptance, and into Europe the quota and the melt-and-pour record now decide landed cost.

Agriculture & food

14 commodities

Grains, pulses, oils, sugar and seeds. Crop year and the contract form usually matter more than the origin on the label.

Designations we are asked for and will not quote

03 commodities

Terms that circulate widely in offer emails and do not correspond to a product anyone can deliver. We publish them because being asked is common, and knowing why the answer is no is worth more than a quotation.

Scope

The index is not the boundary

The 82 entries here are the materials we are set up to source, and we add to them as we take on new supply. If what you need is not listed, send the requirement anyway — a material we have not written a page for is not a material we cannot work on.

The same goes for a grade, origin or packing you do not see under a commodity that is listed. State it in the requirement and we will work to it.